Full Stack Testing

Full Stack Testing

Goals

  • Stabilize the job:
    • Fix L3 HA failure
    • Look in to non-deterministic failures when adding a large amount of tests (Possibly bug 1486199).
    • Switch to kill signal 15 to terminate agents (Bug 1487548).
  • Convert the L3 HA failover functional test to a full stack test
  • Write DVR tests
  • Write additional L3 HA tests
  • Write a test that validates DVR + L3 HA integration after https://bugs.launchpad.net/neutron/+bug/1365473 is fixed.
Creative Commons Attribution 3.0 License

Except where otherwise noted, this document is licensed under Creative Commons Attribution 3.0 License. See all OpenStack Legal Documents.